Project intelligence
Getting Specified on ADNOC and Aramco Projects
Registration gets you the right to quote. The specification is the biggest lever you have. Here's how the two work on ADNOC and Aramco projects, and where the work is actually won.
A Parteloa guide · Updated
Manufacturers spend a year and a small fortune getting registered with ADNOC or Aramco, then wonder why the orders never came. The approved vendor list isn't the win. It's the right to turn up. The list, the specification and the relationships together are what win the work.
- Registration gets you the right to quote. ADNOC and Aramco both say so in plain terms. It doesn't get your product into the specification.
- ADNOC registers and prequalifies suppliers through its Supplier Hub on SAP Ariba. Overseas manufacturers register through an Abu Dhabi based agent.
- An ICV certificate isn't required to bid for ADNOC, but a higher score gives you an edge at evaluation. Aramco's IKTVA is required.
- The specification is written upstream by engineering teams, long before the tender. It's the biggest lever you have, and work is still won from the vendor list on the EPC relationship, the budget and a sharp commercial case.
Registration and specification are two different things
People treat the approved vendor list as the finish line. It's the start line. Registration makes you eligible to receive enquiries and submit quotes. Specification decides which products a project is designed around. They're run by different people, at different stages, for different reasons. Aramco puts it bluntly on its own supplier pages: registering and qualifying doesn't guarantee you future business.
How you get on the ADNOC list
ADNOC runs registration and prequalification through the ADNOC Supplier Hub, which sits on SAP Ariba. There's no fee. In practice it runs in four steps.
How you get on the Aramco list
- Registered and qualified are different stages. Registered means an Ariba account, a completed supplier questionnaire and a vendor ID. Qualification is separate and can include document reviews and technical and quality audits of your factory.
- 9COM codes are categories, not you. A 9COM is Aramco's classification for a class of materials. Pick the wrong codes and your paperwork won't match what you're applying to supply.
- Each plant is approved in its own right. A second factory needs its own approval.
- IKTVA is required. Aramco states that taking part in its In Kingdom Total Value Add programme is required to do business with it.
On the ADNOC side, an ICV certificate isn't required to take part in tenders, but suppliers with higher scores get a competitive edge and ICV documents are expected in commercial bids.
Where the specification is written
The specification for a project is written months before the tender appears, by the engineering and design teams inside the operator or the EPC contractor. They decide which standards apply, which products are acceptable, and sometimes which product by name. Get into that work and the odds swing hard your way.
You get specified by reaching the people who write it, early, and giving them a technical reason to name you. That means the design engineers, the project engineers and the technical authorities inside the operator and the EPC, and making sure the standard your product meets is called up. A registration agent can't do that for you.
Where Parteloa comes in
The specification and the contractor relationships both depend on one thing: seeing the project while the decision is still live. Parteloa watches the operators, contractors and projects you care about, pulls signals from news, filings, registries, tenders and trade press, checks them across sources and scores the momentum, so a programme surfaces early enough to work. Not just ADNOC and Aramco. Any market you sell into.
- Put an operator, an EPC contractor or a project under watch
- Get the early signal that a programme is moving, checked across sources, not a single headline
- See it while the specification and the relationships are still in play
For the full registration detail, including the ICV and IKTVA rules, read the ADNOC and Aramco specification guide on Venti Red.